Category: | Cycleway: An example of good practice |
Tags: | None |
Date time: | 2.32pm, Monday 6th August, 2018 |
Time line: | Earlier | Later |
Facing: | South west |
Added by: | tomajeffs |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Bury |
Panoramic view of the route the new cycleway takes across this existing bridge. At the top left you can just about see two metal fence sections - these are to slow cyclists approaching the steep curve, and seem spaced adequately to allow most cycles through.
Comments reflect the views of the original submitter only.